Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Stones Materials Wholesale: Reorder Timing by Season

Words and bench work · HOLYCOME workshop

Stones Materials Wholesale: Reorder Timing by Season
Bench study — Stones & grading

Every January I get the same email: buyer needs 5,000 pieces of 2mm round moissanite melee by the second week of February, for Valentine's. I have to say no, kindly, and explain that the rough is booked, the cutters are booked, and the shipping lane is booked. Not because we cannot make it. Because nobody can make it in eleven days without breaking quality.

So let me write down what I actually watch on the floor across a year. This is not a stone grading lesson. It is a calendar lesson for anyone buying stones materials wholesale, and it is the thing that separates buyers who hit their launch dates from buyers who air-freight at three times the rate.

01The four hard deadlines that drive everything else

US and EU jewelry demand runs on four retail walls: Valentine's, Mother's Day, back-to-school plus early holiday pre-orders, and the November-December peak. Each wall sits roughly 6 to 10 weeks after the wholesale order was placed. Work backwards from the shelf, not forward from your budget approval.

Here is the window I give every new account. Treat it as a starting grid, not a guarantee.

Retail eventGoods must leave factoryPlace wholesale orderStone types that stress first
Valentine'sDec 20 to Jan 5Late Oct to mid Nov2mm to 3mm round melee, 925 silver settings
Mother's DayMar 10 to Mar 25Mid Jan to early FebFancy shapes, oval and pear, larger carat sizes
Back-to-school and early holidayJul 20 to Aug 10Early to mid JunStuds, small pendants, silver chain
November-December peakSep 25 to Oct 15Late Jul to mid AugEverything, especially calibrated melee

Note the pattern. The order date is not the pain point. The pain point is two weeks before the order date, when the good cutters are already allocated to someone who planned earlier.

02Why melee disappears before the big stones do

Ask any factory scheduler and they will tell you the same thing. Calibrated small goods are the bottleneck, not 1ct solitaires. A 2.0mm round requires the same handling per stone as a 6mm, but you need hundreds of them to fill one tray. When holiday demand hits, cutting capacity shifts to whatever has the shortest setup, and small calibrated sizes are exactly that.

So my rule for wholesale buyers: lock melee first, lock fancy cuts second, negotiate price last. If you reverse that order, you will get a beautiful price on an oval that arrives after your catalog print date.

The February trap

Chinese New Year falls in late January or February depending on the lunar calendar. Our production calendar loses roughly two weeks of output, and the ramp-back week is never full speed. Any order placed in the four weeks before the break is effectively competing with orders placed two months earlier. Buyers who put their Mother's Day order in during the pre-holiday rush are the ones who end up paying express freight.

03What a realistic lead time looks like

Our standard production run is 12 to 18 days after artwork and deposit clear. That number assumes the stones are in stock or the rough is on the shelf. If you need a custom cut in a size we do not hold, add cutting time, and add it generously.

MOQ is 1 piece for stock items and 30 pieces for custom work. That split matters for seasonal planning. Small test orders let you validate a shape in March and commit to volume in June without holding dead inventory through the slow quarter.

For reference, our cost, speed and yield run about 20 percent better than typical trading companies on the same spec. The reason is boring: we cut in-house and we buy rough directly, so there is no middle layer adding margin and no second party re-inspecting goods that were already inspected.

04The QC calendar behind the delivery date

Lead time is not just machining. Three checkpoints eat real days, and skipping them is how you get a container of stones that fails your own incoming inspection.

  • Incoming stone check: color, clarity, measurement tolerance against the spec sheet, and certificate match before anything enters the line.
  • In-process check: setting and polishing stages, catching chipped girdles and off-center seats before they become scrap.
  • Pre-ship AQL: sampling per lot, with a documented accept/reject number so the decision is not a matter of opinion.

Certificates follow the same discipline. GRA cards travel with moissanite, and IGI reports are issued where the buyer needs third-party grading for lab-grown diamond. If your retail channel requires a specific body, say so at order placement, not at packing.

05Payment and shipping timing, plainly

We work on T/T with 30 percent deposit and balance against documents. PayPal is fine for samples and small trial orders. Delivery is DDP, typically 5 to 8 days to US and EU addresses once goods are released.

If a supplier quotes you a 6-day production window in peak season without asking about your certificate requirements, they are quoting a wish, not a schedule.

One practical note on DDP: the 5 to 8 day figure is transit, not order-to-door. Build the 12 to 18 day production window on top of it, then add your own receiving and photography time before the goods can go live on your site.

06A simple reorder rule that saves money

Track your sell-through by shape and size, not by SKU count. When a size hits 40 percent remaining and the next retail wall is more than eight weeks out, reorder. When it hits 40 percent and the wall is closer than eight weeks, reorder and pay for the faster lane rather than gamble.

Keep a standing buffer of the five sizes that appear in more than half your designs. For most of our trade accounts that is 1.5mm, 2.0mm, 2.5mm, 3.0mm round and one 4x2 marquise. Buffer stock is cheap compared to a missed launch.

Finally, send your forecast even when it is soft. A rough number in June lets us reserve cutting capacity in July. Silence gets you whatever is left.

07Frequently Asked Questions

What is the MOQ for a seasonal trial order?

Stock items start at 1 piece, and custom cuts start at 30 pieces. Most buyers test a new shape at the 30-piece level in the quiet quarter, then scale to volume two months before their peak retail window.

How far ahead should I place a peak-season order?

Production runs 12 to 18 days, then DDP transit is 5 to 8 days. Add certificate lead time if you need IGI reports. For November-December selling, place the order by late July or mid August.

How is pricing quoted for wholesale stones?

Price is quoted per carat or per piece depending on the item, based on size, grade, cut and certificate requirement. Custom sizes carry a setup cost that drops sharply once the order passes 30 pieces.

Send your size list, grade spec and target ship date to service@holycome.com or message WhatsApp +86 133 7744 7107, and we will come back with a quote and a sample plan that fits your calendar rather than ours.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window