Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Care Maintenance Wholesale: Seasonal Reorder Calendar

Words and bench work · HOLYCOME workshop

Care Maintenance Wholesale: Seasonal Reorder Calendar
Bench study — Care & after-sales

01Why reorder timing beats price haggling

Most buyers who lose money on jewelry wholesale do not lose it on the unit price. They lose it on a shipment that lands three weeks late, or on a restock that arrives after the gifting window has closed. I have watched this happen from the QC bench for twelve years, and it almost always traces back to a reorder placed against a calendar that did not match the factory floor.

Care maintenance wholesale is not just polishing cloths and ultrasonic cleaners. It is the whole resupply rhythm around your moissanite, lab-grown diamond and 925 silver lines, including the care items that move with them. Get the rhythm right and you stop paying air freight for panic orders.

What follows is the working calendar we share with trade buyers, plus the production and QC facts you need to slot your own orders into it.

02The four demand windows we actually plan around

Retail demand for bridal, gifting and self-purchase jewelry does not spread evenly. It clusters. If you map your sales history against our production schedule, four windows show up year after year.

  • Window one, late January to mid February: Valentine restock. Small, fast, high-margin. Stock sizes and best-selling solitaire settings.
  • Window two, April to early June: bridal and graduation. Engagement rings, wedding bands, studs. This is the heaviest custom period.
  • Window three, late August to October: holiday build-up and Q4 wholesale accounts. Buyers lock in before the factory fills.
  • Window four, November to mid December: replenishment only. Nobody should be starting a custom run here.

The mistake I see most often is treating window three like window four. Holiday stock needs to be on your shelf by early November, which means the purchase order is signed in August, not October.

03Counting backwards from the shelf, not forwards from the PO

Every reorder should be planned backwards from the date product needs to be sellable. Here is how the timeline stacks up for a standard order.

StageStock itemsCustom itemsNotes
Order confirmation and deposit1 day1 to 2 days30% T/T deposit standard; PayPal accepted for samples
Production3 to 5 days12 to 18 daysCustom CAD and stone setting add the bulk of the time
QC and documentation1 to 2 days2 to 3 daysThree-stage QC, GRA and IGI certificates issued
DDP delivery5 to 8 days5 to 8 daysDoor to door, duties handled

Add a buffer. A custom bridal order confirmed in mid April will not reliably be in your hands before mid May once you allow for a stone substitution or a sizing correction. If your retail window opens in early May, the PO should have been signed in late March.

Stock items are more forgiving. A replenishment of standard moissanite studs or silver chains can turn around inside two weeks door to door, which is why we hold MOQ at one piece for anything in the stock catalog.

04What changes by season on the factory floor

Spring: the custom crush

From late March the custom queue tightens fast. Bridal buyers all want the same 12 to 18 day production slot at the same time, and setting benches become the bottleneck, not stone supply. Place custom orders early or accept a later ship date.

Summer: the quiet window for smart buyers

July and early August are the cheapest weeks to build inventory. The floor has capacity, freight is calm, and we can run larger pre-production batches. Buyers who use this window arrive at Q4 with stock already paid for and stored.

Autumn: capacity, not price, is the constraint

By September the question stops being what a piece costs and starts being whether it can be made in time. We hold roughly 20% more effective capacity than typical trading companies because we cut, set and plate in-house instead of brokering between workshops. That is the concrete reason our cost, speed and yield run about 20% better, and it is why we can still take a late September custom order that a broker cannot.

Winter: replenish, do not originate

From late November, order stock only. Custom CAD work in December invites errors nobody has time to fix before the season ends.

05The care and maintenance SKU layer

Do not forget the accessories that ride along with the jewelry. Polishing cloths, silver dip, ring guards, travel pouches and stone-safe cleaner kits are low-value items that quietly lift average order value and reduce returns caused by tarnish complaints.

These items are simple to produce and easy to over-order. Our advice is to attach them to your main jewelry reorder rather than running a separate purchase order, because a combined shipment keeps freight per unit down and simplifies customs paperwork.

One practical note for 925 silver: if you are storing care kits alongside silver stock through a humid summer, keep the desiccant fresh and rotate older inventory forward. Tarnish in the warehouse is a QC failure you inflict on yourself.

06Where QC has to sit in the calendar

Our three-stage inspection is built around reorder timing, not around convenience.

  • Incoming stone check: every moissanite and lab-grown parcel is verified for color, clarity and measurement before it enters a job.
  • In-process check: settings, prongs and plating are inspected at the bench, before finishing.
  • Pre-ship AQL: a sampling inspection against AQL limits on the finished batch, with GRA and IGI certificates matched to the pieces that carry them.

If you are reordering the same SKU, ask for the previous inspection notes to be pulled. Repeat defects on a repeat order are the clearest signal that a supplier is not tracking its own history.

Buyers who send us their retail calendar in January get a production slot reserved before the spring rush. Buyers who send it in September get a ship date and a polite apology.

07Practical rules for the next twelve months

Work out your own reorder points by looking at last year's sell-through, then subtract the full lead time plus a two week buffer. If a SKU sells 40 units in October, the order needs to be confirmed by early September at the latest.

For custom work, lock designs in the quiet months. Approve CAD in June or July, hold the approved file, and you can trigger production whenever you need it without re-quoting.

Finally, keep your payment terms clean. Thirty percent T/T deposit on confirmation and the balance against documents is standard, and PayPal is fine for samples. Messy payment paperwork delays production more often than people admit.

08Frequently Asked Questions

What is the minimum order for a seasonal restock?

One piece for anything in our stock catalog, and 30 pieces per design for custom work. Seasonal replenishment of standard moissanite, lab-grown diamond or 925 silver items therefore has no meaningful MOQ barrier, which makes it easy to test a SKU before committing to a larger run.

How far ahead should I place a holiday reorder?

Confirm custom orders by late August and stock replenishment by early October. Production runs 12 to 18 days on custom and 3 to 5 days on stock, then QC adds one to three days and DDP delivery takes 5 to 8 days, so the calendar closes faster than most buyers expect.

How is price calculated on repeat orders?

Price is quoted per piece against the confirmed specification, stone grade and metal weight, with the 30% T/T deposit applied at confirmation. Repeat orders on an unchanged specification keep the original basis, so re-quoting is only needed when sizes, grades or plating change.

If you want your seasonal calendar mapped against our production slots, send your SKU list and target shelf dates to service@holycome.com or message WhatsApp +86 133 7744 7107, and we will confirm what can be produced in time and quote it with samples if you need them first.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window