Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Inventory Depth vs Sell-Through: Care Maintenance Wholesale Plan

Words and bench work · HOLYCOME workshop

Inventory Depth vs Sell-Through: Care Maintenance Wholesale Plan
Bench study — Care & after-sales

01Why the Six-Month Plan Beats the Seasonal Guess

Most buyers we quote come in with a seasonal mood board and no idea how deep to go on each SKU. That is where margin quietly leaks. A six-month window is long enough to absorb a slow month and short enough that you are not financing dead stock into next year.

Care maintenance wholesale is not a category you can plan month to month, because the moissanite and lab-grown pieces a buyer reorders are almost never the pieces that sold fastest in week one. They are the studs, the plain bands, the small pendants. The workhorses. Depth on those, discipline on everything else.

We run this planning alongside clients every week from the factory floor, and the pattern is consistent: the buyers who under-stock the basics lose more to stockouts and rush freight than they ever save on inventory carry.

02Sort Every SKU Into One of Three Depth Buckets

Before you talk depth, split the assortment. Depth is not a number you apply across a catalog; it is a decision per bucket.

  • Core reorder items: 3mm to 5mm studs, solitaire bands, small bezel pendants. These get the deepest cover, typically 8 to 12 weeks of forecast demand.
  • Fashion swing pieces: larger halos, colored moissanite, trend shapes. Cover 4 to 6 weeks and let sell-through decide whether they graduate.
  • Test and sample stock: one to three pieces per design. Cheap to hold, and they tell you fast whether a design earns a second order.

The mistake we see most is treating a fashion swing piece like a core item because the first sample photographed well. Photos sell samples; sell-through sells depth.

03Reading Sell-Through Honestly in the First 60 Days

Sell-through percentage alone will mislead you if you do not pair it with weeks of cover. A 60 percent sell-through in three weeks is a reorder signal. The same 60 percent over four months is a slow mover wearing a decent number.

Build the review around two checkpoints. Day 30 tells you direction, not truth, because early sales skew to whatever you pushed hardest. Day 60 is where the real signal sits, and that is the point where we can usually turn a reorder around in 12 to 18 days for custom work, or ship from stock immediately at one piece minimum.

Our own turnaround sits roughly 20 percent ahead of typical trading companies on both cost and speed. The reason is structural rather than promotional: we cut and set in the same building where QC signs off, so a reorder does not wait on a third-party consolidator to collect goods from several workshops.

04Where Care and Maintenance Touches the Stock Plan

Care maintenance wholesale planning has a physical side that pure spreadsheet buyers ignore. Plated silver and rhodium finishes age in storage. Stones get handled. A warehouse that sits on six months of a delicate finish can ship a piece that already needs a polish.

Practical rules we give buyers holding deep stock:

  • Keep 925 silver in sealed bags with anti-tarnish strips, and rotate oldest first.
  • Hold rhodium-finished pieces away from humidity; a cheap hygrometer in the stockroom pays for itself.
  • Inspect a random five pieces per bin at each reorder point, not just at intake.
  • Train whoever packs orders to spot a loose prong before it becomes a return.

Deep inventory is only an asset if it still looks new on the day it ships. Budget a small care allowance into your six-month plan rather than discovering the problem in month five.

05A Simple Depth Model You Can Copy

Below is the working frame we hand to buyers starting a six-month cycle. Adjust the percentages to your own cash position, but keep the logic.

BucketShare of buyWeeks of coverReorder triggerLead time
Core basics55%10 to 124 weeks of cover leftStock, 1 pc MOQ
Proven mid-tier25%6 to 83 weeks of cover left12 to 18 days
Fashion swing15%4 to 6Sell-through above 50% at day 6012 to 18 days
Test stock5%1 to 3 pcsAny repeat inquirySample, 1 pc

Custom work starts at 30 pieces per design and runs 12 to 18 days in production. Stock items ship from one piece. That split is what makes the test bucket affordable at all.

06QC Holds and How They Affect Your Reorder Timing

Every order passes three checks here: an incoming stone inspection, in-process checks at setting and polishing, and a pre-ship AQL sample against the agreed spec. That last stage is the one that changes reorder math, because a hold adds days.

Plan your reorder trigger with the QC window inside it, not after it. If you reorder at three weeks of cover and production takes 12 to 18 days, you are already tight once a pre-ship sample gets pulled. Reorder at four weeks for anything you cannot afford to be out of.

Buyers who treat the QC hold as part of lead time rather than an interruption to it rarely run stockouts on their core line.

Certificates matter here too. We supply GRA reports for moissanite and IGI for lab-grown diamond, and those documents need to match the parcel exactly. A mismatch at pre-ship is a real delay, so confirm the certificate body on the purchase order before production starts.

07Cash Flow and Payment Terms Inside the Plan

Depth is a cash decision as much as a stock decision. Our standard terms are 30 percent T/T deposit with the balance against shipping documents, and PayPal for samples. That structure lets you put cash into core depth early and keep the fashion bucket light until sell-through earns it.

Delivery runs DDP in 5 to 8 days on stocked goods, which compresses the whole cycle. If you are shipping to the US or EU, factor duties and clearance into the landed cost before you set your reorder trigger, not after.

One more thing worth saying plainly: do not let a supplier talk you into depth on unproven designs to hit a volume discount. The discount is worth less than the markdown you will take in month five.

08Frequently Asked Questions

What is the minimum order for a six-month stock plan?

Stock items start at one piece, so you can build a test and core mix without committing to volume. Custom designs start at 30 pieces per style, and pricing is quoted per piece based on stone grade, metal and setting.

How long does a reorder take once sell-through confirms a winner?

Production on custom reorders runs 12 to 18 days, then DDP delivery adds 5 to 8 days. Stocked core items ship immediately, which is why we push buyers to keep the basics in stock rather than on order.

How is price set on deeper quantities?

Price is quoted per piece and steps down with quantity, with stone grade and metal weight as the main variables. We confirm GRA or IGI certification on the quote so you are comparing like for like.

If you want a depth plan built around your actual sell-through, send your top SKUs and current weeks of cover to service@holycome.com or message WhatsApp +86 133 7744 7107. We will come back with a six-month buy recommendation, sample pieces for anything unproven, and a quote with certificate body and lead time stated up front.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window