Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Incoming QC Checklist: Care Maintenance Wholesale Jewelry

Words and bench work · HOLYCOME workshop

Incoming QC Checklist: Care Maintenance Wholesale Jewelry
Bench study — Care & after-sales

Most buyers think their job ends when the tracking number goes live. It does not. The first sixty minutes after a wholesale carton lands on your bench decide whether you have a clean claim or an argument. I have run the QC side of this factory for twelve years, and I have watched good buyers lose money because they opened a box, counted pieces, and pushed it to the shelf.

This is the incoming inspection sequence I would hand a new receiving clerk on day one. It is built for moissanite, lab-grown diamond and 925 silver care maintenance wholesale orders, but the logic holds for any accessory line. Print it, tape it to the wall, and time yourself against it.

01Minute 0 to 5: Photograph the Carton Before You Cut Anything

Damage claims live and die on the outer packaging record. Get four shots of the sealed carton, all sides, with the shipping label readable. Then one shot of the carton next to a tape measure so scale is not in dispute.

Only after that do you cut. If the tape is split, the corner is crushed, or there is water staining, photograph it before you touch the contents. A carrier will ask for those images within days, not weeks.

  • Four carton shots plus label close-up
  • Scale reference in at least one frame
  • Photo of any crushed corner or split tape
  • Note the arrival time and the carrier name

02Minute 5 to 15: Reconcile the Paperwork Against the Carton

Your packing list, commercial invoice and the certificate stack should all agree on quantity, SKU and stone grade. Pull the GRA and IGI certificates now, not later. Count them against the line items before anything is unwrapped.

This is where I see the most avoidable disputes. A buyer receives 200 pieces, counts 200, and never checks that 200 certificates came with them. Two weeks later a customer asks for the card and there is a gap. Count the certificates first, because they weigh nothing and cost the most to replace.

CheckDocumentWhat to ConfirmFail Action
QuantityPacking listPiece count per SKUHold carton, email factory same day
StonesGRA / IGI cardsOne card per certified pieceRequest reissue before shelving
MetalInvoice925 stamp claim matches orderPhoto of stamp, escalate
ValueCommercial invoiceDeclared value vs. POFlag to your broker

03Minute 15 to 30: The Stone Table Check

Now you open. Lay every piece on a white tray under a daylight lamp, not a warm showroom bulb. Warm light hides yellow tint and softens feather inclusions, which is exactly what you do not want at receiving.

Run a loupe pass at 10x on a sample of at least ten percent of the order, or twenty pieces, whichever is larger. Look for chips at the girdle, surface scratches, and any stone sitting proud of its seat. On 925 silver, check the prong tips for tool marks and the setting for rocking movement.

What a stone table check actually catches

Girdle chipping from a rough set, off-color stones mixed into a parcel, and loose prongs that will fail in the customer's hands three weeks later. All three are cheap to fix at the factory and expensive to fix at retail.

Incoming inspection is not about finding fault. It is about building a paper trail that makes the next shipment better.

04Minute 30 to 45: Silver, Plating and Finish

925 silver is soft and it tarnishes in transit if the packaging is wrong. Open a sealed pouch and smell it. A sharp sulfur note means the anti-tarnish strip failed or was never there. Check for pitting, solder bleed at the joins, and plating color shift between pieces in the same lot.

If you are buying rhodium or gold-plated silver, compare three pieces side by side under the same lamp. Color drift within one SKU is a plating bath issue and it will show up as returns, not as a complaint. Photograph the three-piece comparison and send it as your evidence.

05Minute 45 to 60: AQL Sampling and Sign-Off

Pull your sample size per the AQL level on your PO, usually general inspection level II with a 2.5 major and 4.0 minor threshold. Grade every defect you find against the written definition, not against your mood. Then sign the sheet and file the photos.

Our own pre-ship AQL runs before the carton is sealed, which is why we quote a defect rate we can stand behind. Because we check stones on arrival at the factory, again in-process, and a third time before shipping, our cost, speed and yield run roughly twenty percent better than a typical trading company that only inspects at the end. The reason is simple: catching a bad stone lot on day one costs a phone call, catching it on day eighteen costs a reorder.

  • Sample size per AQL level II, 2.5 major / 4.0 minor
  • Defect definitions written down before you start
  • Photo of every major defect, labeled by SKU
  • Signed inspection sheet filed with the packing list
  • Claim email sent within 48 hours if you fail the lot

06What to Do When the Lot Fails

Do not ship it to your customer and hope. Send the photos, the AQL sheet and the quantity affected to your factory contact the same day. A good factory will offer rework, replacement or a credit against the next order, and will want the failed pieces back for their own root cause review.

On our side, stock items ship from one piece, custom runs start at thirty pieces, and production sits at twelve to eighteen days. Terms are thirty percent T/T deposit with the balance before dispatch, and PayPal is fine for samples. Delivery is DDP in five to eight days, so a replacement lot does not wreck your season.

07Frequently Asked Questions

What is the minimum order for a care maintenance wholesale restock?

Stock items ship from one piece, so a small restock is not a problem. Custom designs start at thirty pieces per style, and pricing is quoted per piece based on stone grade, metal weight and setting complexity.

How long from order to my receiving bench?

Production runs twelve to eighteen days after deposit and artwork approval. DDP delivery adds five to eight days, so plan roughly three to four weeks door to door for a custom run.

How is price calculated, and what certificates come with it?

Price is per piece, set by stone grade, metal weight and labor. Certified pieces ship with GRA and IGI cards, and every order clears a three-stage QC pass before it is sealed.

If you want the checklist turned into a quote, send your SKU list, target quantity and stone grade to service@holycome.com or message WhatsApp +86 133 7744 7107. Ask for samples first if you want to run this inspection on your own bench before committing to a full order.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window