Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Care Maintenance Wholesale: First-Order Landed Cost Math

Words and bench work · HOLYCOME workshop

Care Maintenance Wholesale: First-Order Landed Cost Math
Bench study — Care & after-sales

01Why the Sample Price Is Never the Order Price

Most first-time buyers I talk to build their budget off a sample invoice. That number is real, but it is a sample number. It carries PayPal fees, express freight on one or two pieces, and often a hand-picked stone. None of those costs scale the same way when you move to 200 or 500 pieces.

So before you wire anything, sit down with the actual landed cost of the full order. I have watched buyers approve a unit price that looked fine and then get surprised by duty, DDP handling and a certificate fee they never budgeted. The math below is the one I run with buyers on the floor.

One note on the keyword you probably searched: care maintenance wholesale is a category, not a product. It covers the cleaning cloths, polishing pens, ultrasonic-safe storage, rhodium touch-up kits and re-order packaging that keep moissanite and lab-grown pieces selling after the first shipment. The cost logic is the same whether you are buying those or the jewelry itself.

02The Five Cost Blocks on a First Order

Every landed cost I quote breaks into five blocks. Miss one and your margin is guesswork.

  • Goods value at the factory unit price, times quantity
  • Certificate and assay fees per piece or per parcel
  • Outbound freight and insurance to your door
  • Duty, VAT or sales tax at your border
  • Your own receiving, QC and re-labelling labor

People usually remember blocks one and three. Blocks two, four and five are where first orders go sideways.

03Worked Example: 200-Piece Care Maintenance Wholesale Order

Here is a realistic first order: 200 pieces of 925 silver studs set with 5mm moissanite, plus 200 care kits (cloth, pen, pouch) packed one per box. Nothing custom, all in-stock settings.

At our factory the goods value lands around USD 2,900 for the jewelry and USD 480 for the care kits. That is the number on the proforma invoice, and it is the smallest part of the story once freight and duty clear.

Cost block Basis Estimate (USD) Who pays
Goods, 200 pcs + care kits Unit price x qty 3,380 Buyer
Certificates (GRA + IGI) Per certified piece 210 Buyer
DDP freight, 5-8 days Door delivery 340 Buyer
Duty and import VAT Border rate Varies by country Buyer
Receiving QC labor Hours x wage 120 Buyer

Add duty at your own rate on the goods value plus freight. In the US that is typically a modest percentage on silver jewelry; in the EU, VAT is the bigger hit and you recover it if you are registered. Do not let anyone quote you a landed number without your duty rate in it.

04Deposit, Payment Method and Cash Flow

We work on T/T with 30% deposit and the balance against the pre-ship QC report. For samples, PayPal is fine and faster to set up, though the fee sits with the buyer. That split matters for a first order because your cash goes out in two waves, not one.

Plan the deposit date against your production slot, not against your launch date. Production runs 12 to 18 days on stock and custom mixed orders, so a deposit on day one usually means goods ready inside three weeks, then 5 to 8 days DDP to your door.

05Where the 20% Gap Comes From

Our cost, speed and yield run roughly 20% better than typical trading companies on the same spec. That is not a slogan, it is structural. Trading companies buy from a factory, add a margin, and pass along the factory's QC as a black box.

We cut and set in-house, so the stone check, the setting check and the final AQL inspection all happen under one roof. Three-stage QC means an incoming stone check before setting, an in-process check at polish, and a pre-ship AQL sample pull. When a defect is caught at stage one, it costs a stone. Caught after export, it costs a return, freight both ways and a chargeback. That difference is most of the 20%.

Cheap freight is not cheap if your first container arrives with a 6% defect rate and no paper trail to claim against.

06MOQ and What Actually Triggers Custom Pricing

Stock items start at 1 piece. That is deliberate, because buyers should be able to test our finishing before committing. Custom design, custom stone grade or custom packaging moves the MOQ to 30 pieces per SKU.

The jump from 1 to 30 is where your unit price changes shape. At 1 piece you pay sample economics. At 30 the mold, CAD and stone sourcing get amortized, and the per-unit cost drops hard. If you are weighing a first order, 30 is usually the smarter test size than 5, because the price curve flattens right after it.

07Certificate Costs You Should Not Strip Out

GRA cards cover the moissanite identification and are standard on our parcels. IGI reports cost more per piece and are worth it on higher-value lab-grown diamond goods or anything you plan to list with a formal grading claim.

Buyers sometimes ask to skip certificates to shave cost. On a care maintenance wholesale order that is a false saving, because the certificate is what lets your customer re-order with confidence and what protects you in a dispute. Budget it in block two and stop thinking about it.

08Receiving and the Hidden Labor Line

The last block is your own warehouse. Count the parcel against the packing list, spot-check 10%, and log the GRA numbers against the invoice. On 200 pieces that is a few hours. On 2,000 it is a shift, and it belongs in your landed cost.

If you skip it, you find the shortfall at the customer, which is the most expensive place to find anything. Our pre-ship AQL report is designed to make your receiving fast, but it does not replace your own count.

09Frequently Asked Questions

What is the minimum order for a first care maintenance wholesale buy?

Stock items ship from 1 piece, so you can start small. Custom design, stone grade or packaging moves the MOQ to 30 pieces per SKU. Most first orders land between 30 and 200 pieces.

How long from deposit to delivery?

Production takes 12 to 18 days depending on stock versus custom mix. DDP delivery adds 5 to 8 days to your door. Add a few days if you need IGI reports on every piece.

How is the price calculated?

Price is quoted per piece, FOB or DDP, and excludes your local duty and VAT unless stated. Certificates, freight and deposit terms are listed separately on the proforma so nothing hides in the unit price.

Send me your spec, quantity and destination country and I will return a line-by-line landed cost sheet, plus a sample parcel if you want to check the finishing first. Reach the team at service@holycome.com or WhatsApp +86 133 7744 7107 and ask for the first-order cost breakdown.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window