Wuzhou factory · direct wholesale · MOQ 1 pc service@holycome.com WhatsApp +86 13377447107
Studio notes18 November 2026

Buying Guides Wholesale: Deposits, Payment and Freight Terms

Words and bench work · HOLYCOME workshop

Buying Guides Wholesale: Deposits, Payment and Freight Terms
Bench study — Buying guides

01Why the money side trips up first-time importers

Almost every problem I see on a first order is not a stone problem. It is a money-flow problem. The buyer sent a deposit, then discovered the balance was due before the goods left, then found out freight was quoted ex-works and the forwarder wanted another chunk. Nobody lied to them. They just never asked what each number covered.

I have spent twelve years on the QC floor and the shipping desk at a factory in Guangxi, and I have watched hundreds of first orders go sideways for exactly this reason. So this piece is not about picking a shape or a grade. It is about the sequence of payments, what protects you at each step, and where freight terms change the real landed cost.

One framing number to hold onto: on a typical first order, roughly 30% of your cash leaves before a single stone is cut, and the rest is timed to production milestones you can actually verify. Get that rhythm right and importing gets boring, which is what you want.

02The standard split: 30% down, 70% before dispatch

Our normal terms are 30% T/T deposit to start production and 70% balance before shipment, with a copy of the pre-shipment inspection report and packing list sent before the balance is called. That is the industry norm for moissanite and 925 silver, and it is not a negotiating trick.

The deposit covers raw material, and raw material is where the risk sits. A custom silver run means casting grain, and a custom moissanite run means rough stone allocated to your sizes. Once that is committed, the factory has spent money on your behalf. That is what the deposit is for.

For samples and small stock orders we accept PayPal, which most first-time buyers prefer because it gives them a dispute channel. On production orders above sample size, PayPal fees and currency conversion usually make T/T the cheaper route for both sides.

  • T/T 30% deposit, 70% before dispatch, on custom production
  • PayPal accepted for samples and low-value stock orders
  • Pre-shipment inspection report shared before balance is requested
  • Bank charges split per your bank, stated on the proforma invoice
  • Balance never due before goods physically pass final QC

03What the deposit actually locks in

A deposit is not a reservation fee on a warehouse shelf. It converts into material, labor slots and a production date. The moment it clears, your order enters the schedule and the die or CAD file work begins on custom pieces.

This is also where MOQ shapes the money. Stock items ship from one piece, so a buyer testing a new market can place a small order and pay in full without a deposit at all. Custom work starts at 30 pieces per design because the setup cost only makes sense at that volume. Below 30, the per-piece setup would eat the margin and you would be paying for a mold you do not need.

If a supplier asks for 50% or 100% up front on a custom order with no inspection report before the balance, that is not standard trade practice. It is a cash-flow request. Ask what milestone the second payment is tied to.

04Production timing you can plan freight around

Standard production runs 12 to 18 days after deposit and artwork approval, and that clock starts when both land, not when you first enquired. Custom CAD or mold work can add a few days before cutting begins. Stock orders usually leave faster because they skip the tooling stage.

We run three QC gates inside that window: an incoming check on every parcel of rough stone and casting, an in-process check during setting and polishing, and a pre-ship AQL sampling against the agreed spec. Certificates go out with the goods, GRA for moissanite and IGI where the order calls for lab-grown diamond documentation. Your balance request should arrive with that AQL result attached, not before it.

Our own cost, speed and yield run about 20% better than typical trading companies on comparable orders. The reason is structural rather than promotional: we cut and set in-house instead of buying finished goods from a third party, so there is no middle layer adding markup and no extra handoff adding days to the schedule.

05Freight terms decide your landed cost

This is the part first-time importers underestimate most. The unit price on the invoice is not your cost. Freight terms decide whether it is.

We ship DDP by default for US and EU buyers, which means delivery in 5 to 8 days with duties handled and the goods arriving at your door. You get one number and no surprise invoice from a customs broker. FOB and EXW are available if you have your own forwarder and want to consolidate, but then the duty, clearance and last-mile cost sit with you.

Ask for the freight line separately on every quote, even when you intend to take DDP. If a supplier cannot break freight out from the unit price, you cannot compare two quotes honestly, and you cannot tell whether a cheaper unit price is real or just freight pushed into the product line.

TermWho arranges freightWho pays dutyTypical transitBest for
DDPFactoryFactory, included5-8 daysFirst orders, no broker set up
FOBBuyer's forwarderBuyerVaries by routeConsolidating multiple suppliers
EXWBuyerBuyerVaries by routeBuyer with local China agent

06Documents to collect before you release the balance

Payment release should be conditional on paper, not on trust. Before the 70% goes out, you want the commercial invoice matching the proforma, the packing list with carton counts and weights, the certificate set, and the AQL inspection result. If any of those is missing, the balance waits.

For EU buyers, confirm the certificate body and the metal stamp on the paperwork matches what you ordered, since assay office rules differ by country. For US buyers, confirm the chain and clasp composition is stated, because 925 silver claims get tested at the border more often than people expect.

  • Commercial invoice matching the approved proforma exactly
  • Packing list with carton count, gross and net weight
  • GRA certificate per moissanite parcel, IGI where specified
  • Pre-shipment AQL report with the sampling level stated
  • Metal stamp and assay documentation for 925 silver

07Sample orders: the cheapest risk you will ever buy

If you are new to a supplier, spend the sample money. One piece from stock, paid by PayPal, tells you more about setting quality, polish and stone matching than any catalog photo. It also tests their communication speed before real money is on the table.

Treat the sample as a spec document. Once you approve it, reference the sample number on the production order so the QC gate has something concrete to compare against. Buyers who skip this step are the ones who end up arguing about shade and finish at the balance stage.

08Frequently Asked Questions

What is the minimum order and how does that affect payment?

Stock items ship from one piece and are usually paid in full, which suits sample and test orders. Custom designs start at 30 pieces per style and run on 30% T/T deposit with 70% before dispatch. The split exists because custom work commits raw material and tooling up front.

How long from deposit to delivery?

Production takes 12 to 18 days after deposit and artwork approval, plus 5 to 8 days DDP transit to the US or EU. Add a few days if CAD or mold work is needed before cutting. Stock orders move faster because there is no tooling stage.

How is the price calculated, and is freight included?

Unit price is quoted per piece by stone grade, metal and setting, with freight shown as a separate line so you can compare suppliers honestly. DDP quotes include duty and delivery, while FOB and EXW leave duty and clearance with you. Ask for both figures before you decide.

Send your spec, target quantity and destination postcode to service@holycome.com or WhatsApp +86 133 7744 7107 and we will return a quote with the deposit, balance date, certificate list and freight broken out line by line, plus a sample offer if you want to check quality first.

HOLYCOME · est. 2016Commission a piece

Written from the bench in Wuzhou. Figures quoted are current factory ranges, not retail prices; confirm the live number with the quote desk.

Sourcing the pieces this article describes?

The catalogue carries current pricing by category, with MOQ from one sample.

Browse the catalogue Request a quote
Factory directWuzhou workshop, no trading layer
MOQ 1 pieceSamples before bulk
GRA / IGI papersStone grading on request
12–18 daysCustom production window