Buying Guides Wholesale: Landed Cost Math for a First Order
Words and bench work · HOLYCOME workshop

01Why the Unit Price You Negotiate Is Not the Number That Matters
Most first-time buyers come to us with one question: what is the price per piece. That is the wrong starting point, and it is the reason so many first orders end up with a surprise on the debit side. The price on the quote sheet is maybe 60 to 70 percent of what the goods actually cost you to put on a shelf in Los Angeles or Rotterdam.
I have sat in pre-ship inspection meetings for twelve years and watched buyers argue hard over three cents on a moissanite stud, then eat forty cents a piece on freight they never modeled. So let us do this properly. Below is the arithmetic I would run if I were the buyer, not the factory.
02The Six Lines That Make Up Landed Cost
Landed cost is everything you paid to get sellable goods into your warehouse, divided by the number of units that passed inspection. Not the number you ordered. The number that passed. Those are different numbers more often than anyone likes to admit.
- Ex-works unit price times quantity, which is the line everyone looks at
- Export packing, cartons, and inner polybags, sometimes quoted separately
- Freight, whether air express DDP or sea consolidation
- Duty and import VAT or sales tax at destination
- Certificate and assay costs per piece where the item needs them
- Defect allowance, meaning the percentage of units you will write off or discount
There is a seventh line that is invisible but real: your own time. If you are chasing a trading company who is chasing a factory, every question takes two days instead of two hours, and that delay has a cost when a retail launch date is fixed.
03A Worked Example on a 300-Piece Silver and Moissanite Order
Let us use a mixed first order: 300 pieces of 925 silver pendants and studs set with 1 carat equivalent moissanite, average ex-works price of 9.80 USD per piece. This is a realistic small first run, above our 1 piece stock minimum but below the volume where pricing bends.
Note that the shipment weight here is driven by packaging, not by the jewelry. Silver and moissanite are dense but small, so cartons and display boxes dominate the air freight calculation.
| Cost line | Basis | Amount (USD) | Share of total |
|---|---|---|---|
| Goods, ex-works | 300 pcs at 9.80 | 2,940 | 72.4% |
| Export packing and labeling | 0.35 per piece | 105 | 2.6% |
| Air express DDP, door delivery | 38 kg chargeable, 5 to 8 days | 620 | 15.3% |
| Duty and import VAT | Included in DDP terms | 0 | 0.0% |
| GRA cards plus 12 IGI reports | Per certified piece | 230 | 5.7% |
| Defect allowance at 2.5% | Replacement or markdown | 164 | 4.0% |
Total lands at 4,059 USD against 300 pieces, which is 13.53 USD per unit landed versus 9.80 ex-works. That is a 38 percent uplift, and it is completely normal. Any buyer who budgets only the ex-works figure is planning to lose money on the first order and call it a learning experience.
The number that kills first orders is not the factory price. It is the gap between the factory price and the delivered cost, and most buyers never write that gap down before they sign.
04Where the Money Actually Leaks on a First Run
Three lines cause most of the damage, and none of them are the one you negotiate hardest on.
Freight charged on dimensional weight
Couriers bill on whichever is greater, actual weight or volumetric weight. A carton of 200 pendants in individual gift boxes can bill at three times the scale weight. Ask your supplier for the carton dimensions and piece count before you approve the shipping method, not after.
Certification applied to the wrong pieces
Not every unit in a wholesale lot needs a full laboratory report. GRA cards cover the moissanite identity for the bulk of a shipment; IGI reports are worth the money on the higher-value center stones and the pieces your buyer will resell as certified. Certifying everything is a fast way to add five percent to landed cost for no commercial gain.
Defect allowance nobody budgeted
Even with a three-stage QC process, meaning an incoming stone check, in-process inspection on the bench, and a pre-ship AQL sampling pass, a small percentage will not meet a picky retail standard. Budget 2 to 3 percent. If your supplier runs tighter than that, you keep the margin. If they run looser, you have already priced the pain.
05Why Our Numbers Run About 20 Percent Leaner Than a Trading Company
This is not a marketing claim, it is a structural one, and you can verify it by asking any supplier where their bench is.
We cut and set in our own facility, so the stone does not travel from a cutter to a setter to a trading office to a consolidator. Each of those handoffs adds a margin and a week. Because the stone check happens at our own incoming table, we also catch grade mismatches before they become a finished piece, which drops the defect allowance rather than pushing it onto you.
The practical result on a first order is roughly 20 percent better on combined cost, speed, and yield compared with sourcing through an intermediary. Speed shows up as 12 to 18 days production on custom work instead of a month, and 5 to 8 days DDP delivery on stock.
06Payment Terms and What They Cost You
Standard terms are T/T with 30 percent deposit and the balance against the pre-ship inspection report. For samples and small stock runs we accept PayPal, which costs you a fee but removes the wire risk on a first transaction.
Do not treat payment terms as free. A supplier demanding 100 percent upfront is asking you to fund their raw material, and that is a real cost of capital. A supplier taking 30 percent is sharing the risk. That difference belongs in your landed cost model as a financing line, even if it is small at this volume.
- MOQ 1 piece on stock items, so you can test quality before committing
- MOQ 30 pieces on custom designs, per style
- 12 to 18 days production after deposit and design approval
- Three-stage QC with pre-ship AQL report shared before balance payment
- GRA cards standard, IGI reports on request for certified pieces
07How to Build the Model Before You Send a Single Inquiry
Start from your target retail or wholesale sell price and work backwards. Take the sell price, subtract your required margin, subtract duty, subtract freight per unit, subtract the defect allowance, and whatever remains is your true ceiling ex-works price. That ceiling is the only number worth negotiating against.
Then sanity-check it against reality. If your ceiling comes out below the market floor for the grade you specified, your specification is wrong, not the market. Usually it means you asked for a color and clarity combination that does not exist at that price, and a good factory will tell you that on day one instead of shipping you something close and hoping.
Finally, order the sample. One piece, PayPal, delivered in about a week. Compare the stone against the certificate, check the prong work under a loupe, and weigh the piece. That twenty dollar sample will tell you more about your landed cost risk than any spreadsheet.
08Frequently Asked Questions
What is the minimum order for a first wholesale purchase?
Stock designs ship from 1 piece, so a first order can be a genuine sample run rather than a container. Custom designs carry a 30 piece minimum per style because the bench setup and mold work only make sense at that volume.
How long until goods reach my warehouse?
Production runs 12 to 18 days after deposit and approval, and DDP delivery adds 5 to 8 days depending on destination. Total door-to-door on a custom first order is typically four weeks.
How is price quoted, per piece or per carat?
Finished jewelry is quoted per piece ex-works, with the stone grade and metal weight specified in the line item. Loose moissanite is quoted per carat by size and grade band, so always confirm which basis you are comparing.
If you want the math run on your specific assortment, send your target styles, quantities, and destination city to service@holycome.com or message WhatsApp +86 133 7744 7107. We will return a landed cost sheet with freight and duty modeled, plus sample availability on stock items, so you can see the real delivered number before you commit to anything.
